Cardinal Studios
Cardinal Studios
More

Western Tech Systems Headquarters, Refurbishment Center, and Warehouse Facility

In the rapidly expanding industrial landscape of North Texas, where over 70 million square feet of warehouse space is currently under construction, the Western Tech Systems Headquarters redefines the warehouse typology as a sustainable, human-centered workplace. Designed to meet the demands of the on-demand economy while prioritizing employee well-being, this project serves as a bold showcase of the company’s commitment to innovation and environmental stewardship.


Design Approach

As the Project Designer, Gabriel leveraged the site’s long, narrow proportions to maximize spatial efficiency and minimize resources used. The project was able to utilize non-load-bearing walls at each end of the warehouse with Cross-Laminated Timber (CLT) panels supported by steel columns, allowing for expansive glazing across the entry façade. This approach reduces the building’s carbon footprint while introducing a warm, natural material palette to the interior, creating an inviting and inspiring workspace.


Key Features

  • Optimized Circulation: A sawtooth loading dock configuration reduces pavement requirements by 30% compared to the company’s previous facility, streamlining truck access and minimizing environmental impact.
  • Flexible Workspaces: An interior mezzanine utilizes the high-bay warehouse volume to provide adaptable, multi-functional workspaces, supporting the owner’s growing operational needs.
  • Sustainable Systems: The facility incorporates an all-electric HVAC system, electric vehicle chargers for 10% of parking spaces, and infrastructure for future rooftop solar panels, reinforcing its commitment to environmental responsibility.


Impact

The Western Tech Systems Headquarters exemplifies a forward-thinking approach to industrial architecture, balancing operational efficiency with sustainable design and employee-centric spaces. By integrating innovative materials, optimized layouts, and future-ready infrastructure, the project sets a new benchmark for warehouse facilities, harmonizing functionality with environmental and social responsibility.

  • Size: 30,000sf
  • Program: Corporate Headquarters, Refurbishment Center, Warehouse
  • Sustainability Features: Cross-Laminated Timber (CLT) façade, all-electric HVAC, electric vehicle charging stations, solar-ready infrastructure

See The Process

Image by Parscal Group

Program

Corporate Headquarters, Refurbishment Center, Warehouse

About

Owner

Western Tech Systems

Sustainability

Features: Cross-Laminated Timber (CLT) façade, all-electric HVAC, electric vehicle charging stations, solar-ready infrastructure

Studio

Architect of Record

Parscal Group

Role

Designer 

Gabriel Winter served as Project Designer for the project. 

Status

Completed

2022 

Location

Pecos, TX

Back To Projects

Copyright © 2025 Cardinal Studios - All Rights Reserved

Powered by